All servicesProject management
Planning
How it works
How project management starts
Management plugs in after design or alongside supervision on active sites.
- 01
Tell us about your project
Share contractor quotes, programme and your reporting expectations (weekly email, WhatsApp, etc.).
- 02
We scope and quote
The bureau defines management hours, milestones and fee separate from pure supervision if both are needed.
- 03
Agreement and kick-off
After agreement, the manager joins site meetings and tracks cost and schedule against the BOQ.
Delivery managed from the same office
Planning, coordination, budgeting and site reporting when you want the bureau to steer the build not only supply drawings.
- Jean-Claude
- Aline
- Eric
- Claudine

Planning is the order of the work, written down. The survey of the plot comes before the plan is fixed. The plan comes before the permit file. The permit comes before the foundation. The foundation comes before the frame, the frame before the roof, the roof before the finishes that would hide a mistake.
Each line has a duration, not only a name. When the ground takes longer, or a drawing is returned with a question, the plan shows which later task moves. A list of hopes is not a plan. A plan is the sequence a builder and an owner can both look at.
What this includes
- Plot survey, then drawings, then the permit
- Foundation, frame, roof, then finishes
- A duration on each task
- A note of what moves when one task slips
- One sequence the owner and the builder share
The sequence follows the way a building is actually procured: design, permit, then the trades in the order the site can build them.
Talk about thisHow we work
From the first idea to a build-ready project
Every successful building starts with a clear brief, an understood site and coordinated technical work. These six stages follow professional practice from RIBA-style briefing through handover and the Rwanda Building Code in language you can scan on one page.
- 01
Project brief & site assessment
Your requirements, the land and the rules agreed before design starts.
Objective
Understand what the building must do, what the site allows and what investigations are needed before anyone commits to a layout.
What our team does
Architects and project managers hold structured consultations: room counts, circulation, budget range, timeline and quality level. We document priorities and non‑negotiables so the design serves daily life, not only appearance.
Expertise applied
Architectural programming, preliminary zoning review and coordination with licensed surveyors and geotechnical engineers when a topographical map or soil report is required for your UPI.
Site and technical review
On site we assess topography, access, orientation, drainage, neighbouring buildings and utility connections. We do not replace formal survey or soil testing we coordinate those reports when you have them and tell you when they are missing for permit or structure.
What you receive at this stage
- Written project brief and agreed scope
- Site assessment notes and feasibility flags
- List of surveys or reports still required
- Initial programme and fee basis for design
How this reduces risk and cost
You avoid paying for a layout that cannot be permitted or built on your plot. Risks surface early, when changes are cheap.

Survey pegs and levels on a residential plot
Professionals on this stage
Arch. Jean-Claude Habimana
Founder & principal architect
Claudine Mukamana
Project manager
Arch. Aline Uwase
Lead architect
At a glance
- Room list, budget band and timeline captured in writing
- Setbacks, height and coverage checked for your district
- Topo and soil reports flagged if still missing
- 02
Architectural concept & design development
From requirements to a layout you can walk through before full engineering sheets.
Objective
Turn the brief and site facts into a coherent architectural proposal: massing, plans, sections and character that fit the land and your programme.
What our team does
We explore orientation, massing and room relationships hand sketches and study models first, then CAD. Options are compared for light, ventilation, privacy and buildability on sloping or tight plots.
Expertise applied
Registered architects lead spatial planning, circulation and elevations. Structural and services engineers review the concept for column zones, service routes and roof spans before you approve the direction.
Presentation and approval
You receive plans, sections and elevations at a scale you can understand, plus 3D views when agreed in scope. Feedback is recorded; only then do we move to dimensioned working documentation.
What you receive at this stage
- Approved concept layout and massing
- Preliminary plans, sections and elevations
- Recorded design decisions and revisions
How this reduces risk and cost
You see and adjust the house while changes are still inexpensive not after walls are built.

Hand-drawn concept plan and section on the studio table
Professionals on this stage
Arch. Jean-Claude Habimana
Founder & principal architect
Arch. Aline Uwase
Lead architect
Eng. Eric Mugisha
Structural engineer
At a glance
- Massing tested for sun, wind and privacy on your plot
- Structure and services zones agreed before CAD detail
- Your sign-off recorded before working drawings start
- 03
Engineering design & technical documentation
Coordinated architectural, structural and services drawings contractors can price and build from.
Objective
Convert the approved design into dimensioned, code-aware documentation not decorative CAD, but instructions that reduce guesswork on site.
Architectural documentation
Dimensioned floor plans, sections, elevations, details, door and window schedules, finishes and site works drawn for the builder and aligned with Rwanda Building Code expectations and district submission formats.
Structural engineering
In-house structural engineers size foundations, columns, beams and slabs from your geotechnical data and imposed loads Eurocode-based calculations, reinforcement schedules and details. Foundation type follows your soil report, not another project's habit.
Building services & coordination
Electrical, plumbing, drainage and ventilation layouts are routed with structure and architecture so pipe openings, slab penetrations and ceiling zones are resolved before construction. Revisions are tracked across disciplines on bureau-produced sets.
Quantities and specifications
Where included, bills of quantities and material specifications help you compare contractor quotes on the same scope the same basis the studio uses on store plans.
What you receive at this stage
- Coordinated architectural and structural drawing set (PDF + CAD as agreed)
- Electrical and plumbing/drainage layouts for typical residential scope
- Structural calculations and reinforcement schedules
- Bill of quantities when in scope
How this reduces risk and cost
Contractors price the same complete instruction set fewer site surprises, fewer costly variations, clearer accountability between design and build.

Dimensioned architectural floor plan on screen
Professionals on this stage
Arch. Jean-Claude Habimana
Founder & principal architect
Arch. Aline Uwase
Lead architect
Eng. Eric Mugisha
Structural engineer
QS Diane Ingabire
Quantity surveyor & cost planning
At a glance
- Architectural, structural and MEP sheets issued as one coordinated set
- Foundation design tied to your geotechnical report
- BOQ and specs when included in your appointment
- 04
Regulatory approvals & permitting
Permit-ready files and follow-up without promising authority timelines.
Objective
Align the technical design with land-use, building and safety rules, then prepare and support the application through BPMIS in Kigali and district channels.
What our team does
We check setbacks, height, coverage and accessibility against applicable rules, assemble architectural and structural sheets, land documents, forms and supporting layouts (drainage, fire, MEP as required for your building class).
Expertise applied
Architects and engineers who produced the set answer authority queries and revise drawings when comments are technical. Permit success depends on complete land papers and the district schedule we track status and respond; we do not control issuance dates.
What you receive at this stage
- Permit submission drawing package
- Completed forms and document checklist
- Query responses and revision records
How this reduces risk and cost
You spend less time in queues and resubmissions because the file matches what authorities expect for your UPI and building type.

Structural and permit drawing sheet with details
Professionals on this stage
Patrick Niyonzima
Permits & compliance
Arch. Jean-Claude Habimana
Founder & principal architect
Eng. Eric Mugisha
Structural engineer
At a glance
- Land title, UPI and forms checked before submission
- BPMIS and district queries answered by the authors of the drawings
- Approval timing depends on the authority we track, we do not guarantee dates
- 05
Construction supervision & technical support
Agreed inspections and reporting distinct from full-time site management.
Objective
Give the builder clear technical answers and the owner visibility when work is on site especially for clients abroad.
What our team does
At milestones such as setting-out, foundations, frame, roof and services, engineers and architects visit when supervision or inspection is in your licence or contract. We record what was built versus the issued drawings and flag discrepancies.
Expertise applied
Structural review before concrete pours, clarification sketches for the contractor, and photo reports on an agreed rhythm. This is not continuous resident supervision unless you contract project management separately.
What you receive at this stage
- Inspection visit reports with photographs
- Technical clarifications and minor drawing revisions
- Progress summaries for remote clients
How this reduces risk and cost
Design intent reaches the site and you know early if the builder deviates, before concrete hides the mistake.

Concrete frame inspected during construction
Professionals on this stage
Eng. Eric Mugisha
Structural engineer
Claudine Mukamana
Project manager
Arch. Jean-Claude Habimana
Founder & principal architect
At a glance
- Milestone visits not full-time resident supervision unless contracted
- Photo reports for owners building from abroad
- Clarifications and minor revisions logged against the issued set
- 06
Project completion & handover
Close-out inspections, as-built information and maintenance records when in scope.
Objective
Document what was built and give you the information to operate, maintain and later extend the property.
What our team does
Where contracted, we walk the completed work against the permit set, list outstanding items, and update drawings to reflect approved changes made during construction.
Expertise applied
Architects and engineers prepare as-built sheets and a practical maintenance file equipment notes, warranty reminders and key supplier contacts when we supervised or managed the job.
What you receive at this stage
- Completion inspection and snagging list
- As-built drawings when included
- Maintenance and operation file
How this reduces risk and cost
You receive more than keys a record for the next renovation, insurer or buyer, and fewer mysteries behind the walls.

Completed house on handover day
Professionals on this stage
Claudine Mukamana
Project manager
Arch. Jean-Claude Habimana
Founder & principal architect
Patrick Niyonzima
Permits & compliance
At a glance
- Snagging list and completion walk-through when in scope
- As-built sheets reflect approved site changes only
- Maintenance file for equipment and finishes you received
FAQ for your project
Is management separate from supervision?
Supervision focuses on quality and compliance on site. Management adds scheduling, contractor coordination and budget control across the whole build.
When does management start?
Usually after working drawings and permit are in place and a contractor is chosen; earlier involvement is possible on large commissions.
Do you hire contractors for me?
The bureau coordinates and monitors contractors you select; procurement support can be scoped in the project agreement.